Vapour Recovery: Stage I, Stage II and Skid Station Design

Testing, monitoring and records

Vapour recovery is two separate systems, not one. Stage I captures the vapour pushed out of a storage tank when a tanker delivers fuel. Stage II captures the vapour pushed out of a vehicle tank when a customer refuels. They share a name and often a vapour line, but different rules trigger them, different parts build them, and different tests prove them.

That distinction decides budgets. A depot that installs Stage I because its deliveries are large, then finds Stage II applies at the pump, has bought half a system and a second round of civil work. This guide covers what each stage does, which thresholds bring it into force, and what to write into a purchase order. It ends where buyers lose money: a skid station fixes its vapour path at fabrication.

If you are specifying a station now, send the project scope to our team, and we will flag what is missing.

Key Takeaways

  • Stage I and Stage II are separate obligations. In the EU a new station needs Stage II above 500 m³ of petrol a year; an existing one above 3,000 m³ a year had to comply by 31 December 2018.
  • The EU requires at least 85% capture (EN 16321-1:2013) and a vapour/petrol ratio of 0.95 to 1.05, tested annually to EN 16321-2:2013.
  • In the US the federal rule governs the tank side: submerged fill within 6 inches of the bottom for pipes installed after 9 November 2006, and pressure/vacuum vents set to 2.5 to 6.0 inches of water.
  • Stage II is being withdrawn across most of the US because on-board refuelling vapour recovery (ORVR) took over on newer vehicles. Texas finished decommissioning by 31 August 2018.
  • On a skid station the vapour return, vent and ullage sit inside the unit. Adding them after the shell is built is a rebuild, not a modification.

What vapour recovery does at a fuel station

What vapour recovery does at a fuel station
What vapour recovery does at a fuel station

Gasoline gives off vapour at every transfer. That vapour carries benzene, a toxic air contaminant by the California Air Resources Board’s listing, and it helps form ground-level ozone. A vapour recovery system captures it instead of venting it.

Where the capture point is a storage tank being filled, it is Stage I. Where it is a vehicle tank being filled, it is Stage II.

The safety case runs alongside. Gasoline vapour is explosive between 1.4% and 7.6% by volume in air, the standard NIOSH and OSHA figures, and three to four times denser than air, so it gathers in low places.

Stage I Stage II
Captured at Storage tank during tanker delivery Vehicle tank during refuelling
Vapour goes Back into the tanker Back into the station tank, or to the dispenser for resale
Main hardware Vapour return line, vapour-tight couplings, submerged fill, PV vents Vapour recovery nozzle and hose, dispenser pump or balance path, in-station diagnostics
Trigger Delivery volume and tank size Annual throughput and local air rules
Status today Required almost everywhere gasoline is sold Being withdrawn across much of the US

Diesel is different, though. Its vapour pressure at ambient temperature is low, so Stage II is rarely triggered and a diesel-only mining or fleet site normally needs none.

For more information, see our article on 40ft skid station configurations.

Stage I vapour recovery explained

Stage I is the delivery-side system. When a tanker puts 30,000 litres of gasoline into a storage tank, the tank can’t accept the liquid without displacing an almost equal volume of vapour. Without a vapour path, that vapour leaves through the vent.

A vapour balance system gives it somewhere to go. A hose connects the tank’s vapour return to the tanker’s vapour manifold, and vapour moves into the tanker as liquid moves out. The tanker carries it back to the terminal.

Submerged fill and the six-inch rule

Splash filling generates far more vapour than filling from below the surface, because falling liquid strips vapour out of the tank. Submerged filling puts the outlet near the bottom so the fuel rises gently.

Under 40 CFR 63.11117, fill pipes installed on or before 9 November 2006 must discharge no more than 12 inches from the tank bottom. Pipes installed after that date must discharge no more than 6 inches. An alternative is allowed if the operator can show the liquid always covers the fill-pipe opening. Tanks under 250 US gallons are exempt.

Why an open vent defeats the system

No vapour balance system holds pressure, so every tank needs a vent. The vent is where the system usually fails.

A pressure/vacuum vent valve stays shut until the tank needs it, then opens at a set pressure or vacuum. Under the US rule, for sites above 100,000 US gallons a month, the positive setting must be 2.5 to 6.0 inches of water and the negative setting 6.0 to 10.0 inches. The facility’s valves and connections together may not leak more than 0.17 cubic feet per hour at 2.0 inches of water pressure, or 0.63 cubic feet per hour at 4 inches of water vacuum.

Those numbers are small on purpose. A valve set too low breathes continuously, and vents vapour all day. A valve stuck shut turns a delivery into a pressure event. The vapour line also meets the tank at ground level, usually through the manhole well that carries the spill bucket and vapour return connection. That is why Stage I details sit on the tank drawing, not the dispenser drawing.

Stage II vapour recovery explained

Stage II vapour recovery explained
Stage II vapour recovery explained

Stage II moves the capture point to the nozzle. As gasoline enters a vehicle tank, an almost equal volume of vapour leaves it. A Stage II nozzle seals against the filler neck and draws that vapour back through the hose to the station tank.

Two designs do this. A balance system relies on similar pressure in both tanks, with vapour pushed back by the liquid entering. A vacuum-assist system uses a pump at the dispenser to pull vapour actively, coping better with restrictions at the cost of power, control and monitoring at the island.

The vapour/petrol ratio

Effectiveness is the volume of vapour drawn through the system divided by the volume of petrol dispensed. The EU fixes the band at 0.95 to 1.05, where vapour returns to the station tank, tested in service to EN 16321-2:2013.

Below 0.95, the system is under-collecting and vapour escapes. Above 1.05, it’s over-collecting, which pulls air into the tank and can push product out through the vent. Both failures show up on the same test.

ORVR and why Stage II is being withdrawn

On-board refuelling vapour recovery puts the capture canister on the vehicle. The car traps its own vapour whatever station it visits, so the station no longer has to.

Once ORVR vehicles became common, the US Environmental Protection Agency determined the technology was in widespread use and let states remove Stage II from their clean-air plans. Texas is the worked example. The EPA approved the revision on 16 April 2014, decommissioning was allowed from 16 May 2014, and all of it had to be complete by 31 August 2018.

That is therefore a statement about vehicles, not a verdict on the equipment. Stations that keep Stage II may do so, provided they keep testing and maintaining it.

California is the exception. The California Air Resources Board still runs its own certification programme, and components must appear on the certified list to be sold there. A supplier shipping to a US state and to California is working to two rule sets.

One rule catches suppliers: all new Stage II installations in Texas after 1 April 2005 had to be ORVR-compatible under 30 TAC 115.240(a)(3). A system that fights the vehicle’s own canister produces pressure alarms and early shutoffs, which customers report as a faulty pump.

When vapour recovery is required: the thresholds that decide it

Gas station vapour recovery rules are set by throughput, and throughput is measured differently in each market. This table starts a project brief; our skid station permit requirements page covers the approval path.

Jurisdiction Stage II trigger Efficiency or ratio Testing
European Union New station above 500 m³/year, or 100 m³/year under living quarters; existing above 3,000 m³/year since 31 Dec 2018; major refurbishment at 500/100 At least 85% capture, EN 16321-1:2013; ratio 0.95 to 1.05 Annually to EN 16321-2:2013; every 3 years with automatic monitoring
United Kingdom Same Directive thresholds, carried into domestic permitting Same Same, plus a 7-day fault rule and a dispenser notice
United States (federal) No federal Stage II mandate. Tank-side rules at 10,000 and 100,000 US gallons a month Submerged fill, PV vents, static pressure test At installation and every 3 years
California State programme with its own certified equipment list CARB certification Per CARB procedures
Elsewhere Check the national air authority before ordering Varies Varies

Put plainly: 500 m³ a year is about 1,370 litres a day, and 3,000 m³ a year about 8,220 litres a day. A busy forecourt crosses the second threshold; a depot serving its own fleet often doesn’t. The US tiers start at 10,000 US gallons a month, about 37,850 litres, and tighten at 100,000 gallons, about 378,500 litres, where a full vapour balance system is required for new or reconstructed facilities. Vapour recovery is triggered by volume, and volume is something a buyer can forecast before choosing equipment.

What vapour recovery changes in a skid station specification

What vapour recovery changes in a skid station specification
What vapour recovery changes in a skid station specification

A forecourt station is assembled on site, so a missing vapour line is a trench and a week. A skid station is assembled in a factory, so the same omission is a cut shell, a new penetration and a re-test.

The live 40ft skid station guide states the design rule: the requirement follows the product and the throughput, not the tank size. Our skid station solution guide describes the same principle, with vapour recovery listed among systems fitted where the project requires it and diesel-only units commonly built without it.

The container adds four constraints.

The vapour space is smaller and shared. A skid tank is sized to the frame, so over-collection above a ratio of 1.05 has less room to absorb before the vent opens.

The vent is inside the structure. Termination height and direction are fire-code matters settled by the authority having jurisdiction, and on a container, the vent stack is part of the silhouette. Fix it before the frame is built. Our NFPA 30A compliance guide covers the fire-code side.

Compartments can be crossed. A two-grade unit has two vapour paths, and connecting a vapour line to the wrong compartment is a real failure mode, easier to make in factory assembly than on an open forecourt. Label both ends.

Retrofit means recertification. Adding a vapour return to a finished skid needs a new penetration, a pressure test, and a fresh inspection. The cost is the delay, not the pipe.

If you need it, please read our article on AdBlue and DEF storage.

The specification list

Write these into the purchase order, not the covering email.

Item What to specify Why it matters
Stage scope Stage I only, or Stage I and Stage II Decides the dispenser and hose
Vapour return Line size, material, routing, connection type Undersizing raises back-pressure and cuts collection
Vapour-tight fittings Caps that seal on disconnect An open connection is an open vent
PV vent valves Set points, leak rate, test certificate The set point is the pressure control
Submerged fill Discharge height above tank bottom Splash fill creates the vapour to recover
Ullage Working volume and expansion space Over-collection needs somewhere to go
Dispenser Balance or vacuum assist; ORVR-compatible An incompatible pair causes shutoffs
Monitoring Diagnostics, alarm routing, fault log Proves the system works between tests
Labelling Dispenser notice where the rule requires one Easy to forget at commissioning
Documents Test, efficiency and as-built certificates What the inspector asks for first

Ask for the efficiency certificate by name, and check whose equipment it covers. A certificate for a dispenser doesn’t certify the system built around it, and a type approval isn’t an in-service test. The remote monitoring page covers how alarms and logs are handled on an unattended site.

Testing, monitoring and records

Testing, monitoring and records
Testing, monitoring and records

Every jurisdiction tests fuel vapour recovery, and most test the tank rather than the nozzle. The US rule is the most explicit, and a good template for anywhere.

At installation and every three years after, a facility with a vapour balance system must show two things. The vent valves must meet the leak-rate and cracking-pressure limits, tested to CARB procedure TP-201.1E. The tank and vapour system must hold pressure in a static pressure test to CARB TP-201.3 or the Bay Area district’s ST-30.

The pass mark is an equation: Pf = 2e^(−500.887/v), where v is the ullage in gallons, and Pf is the minimum final pressure in inches of water.

Ullage Pass mark
10,000 US gallons 1.90 inches of water
5,000 US gallons 1.81 inches of water
1,000 US gallons 1.21 inches of water

The equation assumes a system starting at 2 inches of water and decaying. Smaller ullage means less vapour to compress and a steeper relative decay, so a nearly full tank must hold the hardest.

The EU adds a monitoring layer. With automatic monitoring fitted, capture efficiency is tested at least every three years instead of annually. In exchange, the monitor must detect faults in the system and in itself, tell the operator, and shut off fuel flow from the faulty dispenser if the fault is not fixed within seven days. That turns a vapour fault into a revenue stop, which is why diagnostics belong in the original specification.

Common specification mistakes

The rules are public. The failures are mostly ordering mistakes.

Ines, a mechanical engineer at an EPC contractor, specified a Stage I vapour return at the same diameter as the product line to save a fitting. It worked at low delivery rates. At the site’s normal 900 litres a minute, the tank pressure rose faster than the balance could equalise; the vent lifted, and commissioning recorded a ratio below the 0.95 floor. The fix was a larger return line and a second inspection, three weeks late.

Chidi, who runs a depot in Lagos, inherited a Stage II installation. Drivers complained that nozzles clicked off early on newer cars. The system had been installed without checking ORVR compatibility, so the vehicle canister and the station vacuum competed for the same vapour. Two years of service calls traced back to one line missing from the original order.

Farah, a procurement lead, compared two 40ft skid quotes on price and capacity. The cheaper unit had no vapour return and a single vent. When the air permit required Stage I, retrofitting meant opening the shell, adding a penetration, and re-testing, which pushed delivered cost above the higher quote. The vapour line is cheap at the factory and expensive in the yard.

In all three cases, the lesson is the same. Vapour recovery isn’t a feature to compare on a sheet but a system whose parts must be sized together, and the cheapest place to size it is before fabrication.

Frequently asked questions

What is the difference between stage 1 and stage 2 vapour recovery?
Stage I captures vapour displaced from a storage tank during tanker delivery and returns it to the tanker. Stage II captures vapour displaced from a vehicle tank during refuelling and returns it to the station tank. One is a tank and delivery system; the other a dispenser and hose system.

Is Stage II vapour recovery still required?
It depends where the station is. Much of the US has withdrawn the requirement because ORVR now does the job on newer vehicles, with Texas completing decommissioning by 31 August 2018. The EU still requires it above its thresholds, and California runs its own certification programme.

What pressure should a pressure/vacuum vent valve be set to?
Under the US federal rule for the highest throughput tier, the positive setting is 2.5 to 6.0 inches of water and the negative setting 6.0 to 10.0 inches. Other jurisdictions publish their own values, so confirm the set points against the permit.

Can vapour recovery be added to a skid station after it is built?
Yes, but at a different order of cost: a new penetration in the shell, re-routing inside a confined frame, a fresh pressure test and usually a new inspection. At the factory, the marginal cost is a line, a valve and a connection.

Where this leaves your specification

Vapour recovery is two systems with one name, and the mistakes come from treating them as one. Stage I is decided by how the tank is filled and tested with a pressure hold. Stage II is decided by throughput, built around the dispenser, and tested with a ratio.

The rules follow the same shape across markets. The EU sets an 85% capture floor and a 0.95 to 1.05 band. The US sets submerged-fill depths, vent settings and a three-yearly static pressure test. Most of the US has retired Stage II because the vehicles took over.

What does not vary, however, is when the decision gets cheap. A forecourt can be amended later. A container can’t. Put the stage scope, vapour return, vent set points, and documents in the purchase order.

If you are configuring a skid station for a site with an air permit, talk to our engineering team before the frame is signed off. The 40ft skid station product page lists the base configuration, and the dispenser guide covers the Stage II hardware at the island. For the nozzle itself, see how the vapour recovery nozzle works.

A vapour recovery system is an emissions control, not an explosion-protection system. Keep the two specifications separate, and give each its own line in the scope. The skid station safety systems guide covers the other half.